Matthew Spoke explains why building more homes is a better approach than trying to limit demand
Matthew Spoke explains why building more homes is a better approach than trying to limit demand
Canada has tinkered with competition policy for too long. It’s time to fully open up the market: David Collins in the Hub

NextStar creates jobs for Windsor-Essex [Video]

Categories
Ontario News

Now that production is set to begin at Windsor’s battery plant, NextStar is looking for some employees to make that production happen.

Around 450 jobs have been filled and another 2,000 are expected to come as production ramps up.

“It’s important to not understate that Canada now has a vertically integrated battery industry with the start of operations here at NextStar,” said Conrad Layson, senior analyst with AutoForecast Solutions. “It literally goes from mine to processing to finished battery product. That’s not a small thing. There are very few countries in the world where that actually happens. Canada joins the top rank having that ability and capability.”

The plant is said to produce enough material to power 450,000 electric vehicles every year, once all the jobs are filled.

Double Trouble: Looking at China from the Baltics / Balkan Devlen with Una Bērziņa-Čerenkova
Double Trouble: Looking at China from the Baltics / Balkan Devlen with Una Bērziņa-Čerenkova
The disturbing truth of Canada’s euthanasia program: Peter Copeland and Ramona Coelho